SeattleHomework Sign in
Redmond, WA 98052 · 178th Pl NE · English Landing Phase 2

12253 178th Pl NE

Built 2017 · 2,658 sq ft
Manage Home
LOT 5,857 SQ FT · APN 235510-0050Lot Structure
Claiming homes opens soon on SeattleHomework.
Claim it to correct details and keep its record yours.

We'll email you a one-time sign-in link.

What's on record

Year built
2017
Living area
2,658 sqft
Lot size
5,857 sqft
Bedrooms
3
Bathrooms
2.5
Home type
Single-family
Parcel (APN)
235510-0050
Last sold
$1,202,320
County value
$1,985,000

Major systems

Heating
Forced air (gas)
Stories
2
Garage
Garage (460 sqft)

See something wrong above? Report an error

Nearby on this street

See all 96 homes on 178th Pl NE →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Upgrade & maintenance timeline

  • 2017
    permit on fileHeating & cooling — Sopa #48955 Edgewood East (English Landing Phase 2) Lot 5 425-889-9345, Gas Piping To The Bbq, Range & Fireplace. Air Conditioning Ready With Line-Sets - Customer Paid For:(3) Gas Piping Only, (1) Gas Water Heater, (1) Heating Equipment Including Ductwork, (9) Vent Fans, (1) Air Conditioners
  • 2017
    permit on fileGeneral remodel — Rnew - Edgewood East (English Landing Phase 2) Lot 5 - Plan 01El Elevation A Garage Right - Construction Of New 2-Story Fire-Sprinklered Single Family Residence. House Consists Of 2566 Sf Dwelling, 462 Sf Garage, 35 Sf Covered Front Porch. Total 3062 Sf.
  • 2017
    permit on filePlumbing — Rnew - Edgewood East (English Landing Phase 2) Lot 5 - Plan 01El Elevation A Garage Right - Construction Of New 2-Story Fire-Sprinklered Single Family Residence. House Consists Of 2566 Sf Dwelling, 462 Sf Garage, 35 Sf Covered Front Porch. Total 3062 Sf.
  • 2017
    permit on fileElectrical — Sopa #48190 - Edgewood East Lot 5 - Zach Guyer 425-559-5213 - New 60Amp U/G Temp Pole, New 200Amp U/G Service Customer Paid For:(1) Low Voltage, (1) Temporary Service, (1) Service - New, (1) Ground Ufer - Per Inspector Visit
  • 2017
    permit on filePlumbing — Sopa #48173 - Edgewood East (English Landing Phase 2) Lot 5 - Zach Guyer 425-559-5213 (1) Back Flow Preventer & Vaccum Breaker, (1) Kitchen Sink, (1) Dishwasher, (1) Garbage Disposal, (1) Clothes Washer, (6) Bathroom Sink, (4) Toilet, (2) Bathtubs, (2) Shower/Valve Replacement, (1) Floor Drains, (2)
  • 2017
    permit on fileHeating & cooling — Sopa#48172 - Edgewood East (English Landing Phase 2) Lot 5 - Zach Guyer 425-559-5213 - Customer Paid For:(1) Gas Logs Insert

Manage this home to schedule a service or to update the timeline.

Systems and their update history

RoofUnknown
Not found in our records yet
HVACOn record
Permit on file · 2017
Water heaterUnknown
Not found in our records yet
ElectricalOn record
Permit on file · 2017
KitchenUnknown
Not found in our records yet
BathroomsUnknown
Not found in our records yet

“Unknown” means we haven't matched a record for it yet — not that it hasn't happened. Own this home? Claim it to fill in what we're missing.